Pipeline network
Ineos Solvents Germany GmbH, Herne
Homepage
OXEA Produktion GmbH & Co. KG, Oberhausen
Homepage
INOVYN Deutschland GmbH, Rheinberg
Homepage
INEOS Manufacturing Deutschland GmbH, Köln
Homepage
Basell Polyolefine GmbH, Wesseling
Homepage
BRASKEM Europe GmbH, Wesseling
Homepage
Celanese Emulsions B.V., Geleen
Homepage
Vynova Belgium N.V., Tessenderlo
Homepage
Borealis Polymers N.V., Mechelen
Homepage
ExxonMobil (MPP), Meerhout
Homepage
INEOS Manufacturing Belgium NV, Geel
Homepage
ExxonMobil, Antwerp (Refinery, APP) via Ekeren
Homepage
BASF Antwerpen N.V.
Antwerpen
Homepage
Shell Nederland Chemie B.V., Moerdijk
zur Homepage
Pernis
Botlek
Maasvlakte
The pipeline network
ARG
Long-term capacity takeover by RC2
RC2 (50/50 joint venture with Port of Rotterdam)
3rd Parties
The pipeline network – including the right to use the parallel pipeline in Belgium – has a total length of approximately 495 km and is located in Germany, Belgium and the Netherlands.
The pipelined laid underground runs in Belgium from Antwerp via Geel, Meerhout, and Tessenderlo to Geleen (Netherlands) and from there on toward Cologne, before branching off northward in Lövenich and continuing via Cologne-Worringen toward Gelsenkirchen and Oberhausen, crossing the Rhine at Dormagen and Dinslaken and the Ruhr at Essen.
From Lövenich, a connecting pipeline links the chemical sites in the Wesseling area, from where there is also a connection to the Infraserv Höchst pipeline towards Kelsterbach and on to Ludwigshafen and the EPS (Ethylene Pipeline Süd) there.
For further information, please contact:
Harald Vogel
Phone: +49 (0) 208 899569-0
Email: harald.vogel@argkg.de
Joris Hurenkamp
Tel.: +31 (0) 6 531 71 568
e-mail: jw.hurenkamp@portofrotterdam.com